Are the MPH Schedule and the Production Schedule the same thing?

No. 

The Production Schedule is created by MPH’s clients and contains a run sheet of what is happening on each day of a Job including work by other companies and departments. It will never include prep or de-prep days. 

The MPH Schedule is created by MPH and provides basic shift information. For example, 

  • Shift start and (estimated) end times 
  • Duty for the day (prep, load-in, flight, TDO etc) 
  • What Allowances apply (if any) 

How will I receive notice if my Schedule changes?

Changes that result in additional working days or hours will be discussed with you to confirm your availability before making the change.  

Changes for fewer working hours are made at the manager’s discretion based on work requirements (shift or Job cancellations may apply). 

You will always be Actively Notified of a Schedule change. 

Specific duties during a shift may be changed at the manager’s discretion. 

Will I know my exact working hours in advance?

Sometimes, but not always. 

Shifts are often different lengths, depending on the Job or department work requirements. The company aims for as much accuracy as possible when creating the Schedule, but sometimes necessary data is not yet provided by Clients or the time it will take to complete work cannot be provided with 100% certainty. 

If you are an employee working on Jobs (Touring classification), you may not have set and regular shift lengths.

Estimated shift lengths are applied in the Schedule based on the work being undertaken per the Estimated shift lengths section of the Schedule and scheduling policy. 

What are Maximum Working Periods?

Maximum Working Periods describe when a Weekly employee works sustained long working hours. They are not a requirement of the Award but instead a policy MPH has set to help manage fatigue. 

When the Maximum Working Period threshold is reached or exceeded, mitigating steps are taken to provide employees with additional time off to rest and regenerate. This is applied as follows:

Accrual TypePeriodConditionsMitigation
Rest DayTwo consecutive calendar weeks (one fortnight)130 hours worked in a fortnightFor each 5h over 130h worked, one Rest Day accrues and must be assigned in the next fortnight.

For more details see: Minimum and maximum working times | Maximum Working Periods  

What are Minimum Call Times? 

A Minimum Call Time is the shortest period that you can be scheduled or called in for a single shift. 

Minimum Call Times are set by the Award, and the length varies by employment basis (Weekly vs Casual). 

Minimum Call Times are paid, provided the entire call time is worked. Otherwise, the hours worked of the MCT are paid. 

For more details see: Minimum and maximum working times | Minimum Call Times 

Weekly 

The Minimum Call Time for Weekly employees is four consecutive hours (4h). 

Casual 

The Minimum Call Time for Casual employees is three consecutive hours (3h). 

When and how are shifts confirmed?

Touring employees 

The minimum notice period for Schedule publishing under the LPA is 7-days. 

However, Touring employee’s working days and estimated working hours are confirmed as far in advance as possible (sometimes months), via email per the Crew Booking process. 

From time-to-time Jobs may confirm late and advanced notice is not possible, but the 7-day notice period always applies (except in extenuating circumstances and by agreement only). 

Weekly Factory and OPSS employees 

The minimum notice period for Schedule publishing under the LPA is 7-days. 

Weekly Factory and OPSS employees typically work set days and hours each week and the default shift entries are: 

Mon – Fri, 08:30 – 16:35 
i.e. 7.6h of work with a 30m unpaid Meal Break 

Employees must check the Schedule each time it is published to confirm what days and times they are working in the following week and should never assume they are working Mon – Fri. 

Casual Factory employees 

The minimum notice period for Schedule publishing under the LPA is 7-days. 

Casual Factory employee hours are scheduled on an ad hoc basis dependent on the needs of the business. They may be called in at the last minute (and accept if they’re available) or can be scheduled months in advance (by agreement).

Managers will phone or email to discuss shifts and once confirmed, the shifts are added to the Schedule. 

Employees must check the Schedule each time it is published to confirm what days and times they are working in the following week and should never assume what shifts they’re working.  

How does MPH decide how employees are scheduled?

When scheduling employees, managers and coordinators consider in this order of influence: 

  1. Employee safety 
    • Via the Fatigue Management policy 
  2. This, the Working Times | Scheduling work shifts policy 
  3. The entire Working Times suite of policies 
    • To ensure all scheduled shifts meet the policy correctly 
  4. The needs of the department and MPH Jobs 
    • That is, what the company requires in terms of the number of people 
  5. Skills required for the Job or task 
    • Examples include, Lighting Technician Level 1, 2, 3; Forklift license; relevant experience 
  6. Training needs and opportunities 
    • What opportunities the company needs to provide to people to develop their skills 
  7. Home and Job geographic locations 
    • That is, where the employee lives, and where the Job is, and what costs the company may incur because of greater distances 
  8. Managing costs to the business 
    • For example, selecting “senior enough” staff, but not necessarily the most-senior 
    • Accommodation costs required 
    • Allocating Split Shifts in known downtime 
  9. Staff preferences 
    • For example, working with Clients they like, in cities they prefer, or with people they like 

When Scheduling employees, managers do not consider: 

  • Personal relationships 
  • “Personality matching”