The Production Schedule will either be:
- Shared in the Job Production Schedule WhatsApp chat; or
- Available in Master Tour if MPH’s Client is using that software
- MPH employees are encouraged to create a login for Master Tour
The Production Schedule will either be:
The MPH Schedule is available in QB Workforce. The same software that you use for logging your work hours.
No.
The Production Schedule is created by MPH’s clients and contains a run sheet of what is happening on each day of a Job including work by other companies and departments. It will never include prep or de-prep days.
The MPH Schedule is created by MPH and provides basic shift information. For example,
Changes that result in additional working days or hours will be discussed with you to confirm your availability before making the change.
Changes for fewer working hours are made at the manager’s discretion based on work requirements (shift or Job cancellations may apply).
You will always be Actively Notified of a Schedule change.
Specific duties during a shift may be changed at the manager’s discretion.
On Mondays, for the next week i.e. 7 days in advance.
Shifts may be confirmed much further in advance, but the Schedule should always be checked when it is published to confirm the specific requirements for the following week.
Sometimes, but not always.
Shifts are often different lengths, depending on the Job or department work requirements. The company aims for as much accuracy as possible when creating the Schedule, but sometimes necessary data is not yet provided by Clients or the time it will take to complete work cannot be provided with 100% certainty.
If you are an employee working on Jobs (Touring classification), you may not have set and regular shift lengths.
Estimated shift lengths are applied in the Schedule based on the work being undertaken per the Estimated shift lengths section of the Schedule and scheduling policy.
Maximum Working Periods describe when a Weekly employee works sustained long working hours. They are not a requirement of the Award but instead a policy MPH has set to help manage fatigue.
When the Maximum Working Period threshold is reached or exceeded, mitigating steps are taken to provide employees with additional time off to rest and regenerate. This is applied as follows:
| Accrual Type | Period | Conditions | Mitigation |
|---|---|---|---|
| Rest Day | Two consecutive calendar weeks (one fortnight) | 130 hours worked in a fortnight | For each 5h over 130h worked, one Rest Day accrues and must be assigned in the next fortnight. |
For more details see: Minimum and maximum working times | Maximum Working Periods
A Minimum Call Time is the shortest period that you can be scheduled or called in for a single shift.
Minimum Call Times are set by the Award, and the length varies by employment basis (Weekly vs Casual).
Minimum Call Times are paid, provided the entire call time is worked. Otherwise, the hours worked of the MCT are paid.
For more details see: Minimum and maximum working times | Minimum Call Times
Weekly
The Minimum Call Time for Weekly employees is four consecutive hours (4h).
Casual
The Minimum Call Time for Casual employees is three consecutive hours (3h).
Touring employees
The minimum notice period for Schedule publishing under the LPA is 7-days.
However, Touring employee’s working days and estimated working hours are confirmed as far in advance as possible (sometimes months), via email per the Crew Booking process.
From time-to-time Jobs may confirm late and advanced notice is not possible, but the 7-day notice period always applies (except in extenuating circumstances and by agreement only).
Weekly Factory and OPSS employees
The minimum notice period for Schedule publishing under the LPA is 7-days.
Weekly Factory and OPSS employees typically work set days and hours each week and the default shift entries are:
Mon – Fri, 08:30 – 16:35
i.e. 7.6h of work with a 30m unpaid Meal Break
Employees must check the Schedule each time it is published to confirm what days and times they are working in the following week and should never assume they are working Mon – Fri.
Casual Factory employees
The minimum notice period for Schedule publishing under the LPA is 7-days.
Casual Factory employee hours are scheduled on an ad hoc basis dependent on the needs of the business. They may be called in at the last minute (and accept if they’re available) or can be scheduled months in advance (by agreement).
Managers will phone or email to discuss shifts and once confirmed, the shifts are added to the Schedule.
Employees must check the Schedule each time it is published to confirm what days and times they are working in the following week and should never assume what shifts they’re working.
When scheduling employees, managers and coordinators consider in this order of influence:
When Scheduling employees, managers do not consider: